Page 10 - MOMA 2018
P. 10

provision of basic supporT
        infrasTrucTure To aGriculTure
        •  Construction – Farm-To-Market Road at Brgys. Camba and San Juan
        Baño; Mapalad to Candating; and Mapalad to San Mateo;
        •  Construction  –  5  Million  Central  Terminal  to  minimize  urban
        district congestion. Due to the decongestion program of the LGU,
        more investors have been coming to Arayat. In fact, Jollibee, Seven-
        Eleven Convenient Store, Star Wings and Cebuana Lhullier are only
        some of the business institutions which are about to conduct full
        blast operations in the municipality;

        public eMployMenT services
        •  Nego-Kart regular monitoring managed by 33 beneficiaries;
        •  Aide for 47 Scavenger Beneficiaries;
        •  Tulong Panghanapbuhay para sa 100 Kataong Disadvantaged
          Displaced Workers;
        •  Hiring of 120 Employees for Arayat Jollibee;
        •  Call Center Training for 30 Applicants;
        •  Trained 40 Hairdressers;
        •  Housekeeping Training TESDA NC2 for 25 Participants;

        environMenTal proTecTion and
        naTural resources ManaGeMenT
        •  full  rehabilitation of Mt.  arayat  national  park (ongoing)  –
        More residents are able to get jobs, create livelihood projects and
        businesses with the reopening of the Mt. Arayat National Park. This
        reflects the policy of localism and showing a gradual improvement
        of life standard.

        •  construction of drainage canal; desilting, sandbagging and
        repair of  dikes;  desilting of  creeks  –  It  is  important  to  build
        drainage canal to drain water from an area having no natural outlet
        for  precipitation  to  avoid  flood  and  waste  water  accumulation.
        The  Municipal  Government  monitors  the  smooth  flow  of  water,
        redirecting through sandbagging and sees to it that flood control
        and safety measures by dike repairs is undergone efficiently. A new
        Payloader was acquired in support of the projects.

        •  solid  Waste Management and  construction of Municipal
        recovery facilities (ongoing) – The construction of the expansion
        of MRF in each of the 30 barangays and the Central Recovery
        Facilities remain a priority for the Municipal Government.  Year-
        round information educational campaign in all barangay is ongoing
        to orient the residents on the provisions of the Ecological Solid
        Waste Management Act 2000. To efficiently deliver the services, a
        10-Wheeler Dump Truck was purchased.


        •  construction  of  barangay  roads/rehabilitation  of  small
        Water impounding project (sWip) – a water harvesting and storage
        structure in  Brgy.  Baliti  with  earth  embankment  spillway,  outlet
        works and canal facilities designed for soil and water conservation
        and flood control during rainy season.


        •  year-round Tree  planting  –  More  concerned  citizens  within
        the municipality have been participating in the  Tree Planting
        Project in line with the restoration of Mt. Arayat forest within the
        protected areas.
   5   6   7   8   9   10   11   12   13   14   15